INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
49
20.
Continue to “Parallel System Initial Startup” on page 60.
Figure 37. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)
Single Parallel-Ready UPS Installation
W
A
R
N
I
N
G
Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk
of electrical shock.
NOTE
Do not make unauthorized changes to the UPSs; otherwise, damage may occur to your equipment
and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS
system will be connected. Be absolutely sure there is no power.
Summary of Contents for Powerware Series
Page 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 2: ......
Page 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Page 119: ......
Page 120: ... 1642016494 164201649 4 ...