FIELD INSTALLED UPM INSTALLATION
EATON
9395 Field Installed UPM Mechanical Installation Manual
S
164201717 Rev 3
www.eaton.com/powerquality
4−5
4.4
Electrical Installation
Install FI−UPM battery wiring from the battery cabinet to the FI−UPM battery terminal
location in the UPS (refer to the applicable UPS manual listed in paragraph 1.4 on
page 1−3). Wiring between the FI−UPM and the UPS, and FI−UPM battery terminals
will be installed by an Eaton Customer Service Engineer. This service is offered as
part of the sales contract for the FI−UPM
.
Contact an Eaton service representative in
advance (usually a two−week notice is required) to request service.
4.5
Initial Startup
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page W−1 become void. This
service is offered as part of the sales contract for the FI−UPM. Contact an Eaton
service representative in advance (usually a two−week notice is required) to reserve a
preferred startup date.
4.6
Completing the Installation Checklist
The final step in installing the FI−UPM is completing the following Installation
Checklist. This checklist ensures that all hardware, cables, and other equipment have
been completely installed. Complete all items listed on the checklist to ensure a
smooth installation. Make a copy of the Installation Checklist before filling it out, and
retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify
the operation of the FI−UPM and UPS system and commission it to support the critical
load. The service representative will verify software and operating setup parameters.
Service personnel may request a copy of the completed Installation Checklist to verify
all applicable equipment installations have been completed.
NOTE
The Installation Checklist MUST be completed prior to starting the FI−UPM and UPS system for the
first time.