Chapter 6—Installation Requirements
32
DG1 Series VFD
MN040002EN—March 2014
www.eaton.com
Rubber Grommet Installation Instructions
Step 1:
Measure the outside diameter of the cable (D1)
used to connect to the drive.
Step 2:
Measure the outside diameter of the
rubber grommet (D2) and select a suitable
D2 (D1 ≤ D2 ≤ D1 + 2 mm).
Step 3:
Cut the rubber grommet at the selected diameter.
Step 4:
Run the cable through the rubber grommet.
Step 5:
Insert the rubber grommet into the conduit plate
together with the cable.
Step 6:
Fasten the rubber grommet and cable with a
self-locking cable tie.
D1 (Cable)
D2 (Grommet)
D1
≤
D2
≤
D1 + 2 mm
Self-Locking Cable Ties
Summary of Contents for PowerXL DG1-323D7FB-C21C
Page 1: ...PowerXL DG1 Series VFD Installation Manual Effective March 2014 New Information...
Page 2: ......
Page 83: ......