34008030EN/AD - Page 20
2. Installation
2.8 Connection of IEC cables to output receptacles
1 - Connect the equipments to the UPS
using the cables
(49)
.
It is preferable to connect the priority
equipments to the four outlets
(2)
and the
non priority equipments to the four outlets
(1)
that can be programmed in pairs (1 and
2).
Connect any high-power devices to the
16 A outlet
(3).
To program shutdown of outlets
(2)
during
operation on battery power and thus
optimise the available backup time, the
EATON communication software is
required.
2 - Fit the connection securing system
(44)
that prevents the plugs from being pulled
out accidentally.
2
1
44
49
3