Completing the Installation Checklist
This checklist ensures that you have completely installed all hardware, cables, and other equipment.
Completing all items listed on the checklist will help ensure a smooth installation. Make a copy of the
installation checklist before filling it out, and retain the original.
Note:
The installation checklist MUST be completed prior to starting the RPP for the first time.
Installation Checklist
o
All packing materials and restraints have been removed.
o
The RPP is placed in its installed location and all doors, side panels, and interior barriers are installed and
secure.
o
All conduits and cables are properly routed to the RPP.
o
All power cables are properly sized and terminated.
o
Branch circuit breakers are installed and wired to load.
o
Cooper Bussmann disconnects and fuses are installed and wired to load.
o
Input power connections are properly installed, including ground conductors.
o
Neutral conductors are installed or bonded to ground.
o
No foreign objects are inside the cabinet.
o
LAN and telephone drops are installed, and LAN and telephone connections have been completed.
(Optional)
o
Alarm relays and building alarms are wired appropriately. (Optional)
o
Air conditioning equipment is installed and operating correctly.
o
The area around the installed RPP is clean and dust–free. (The RPP must be installed on a level floor suitable
for computer or electronic equipment.)
o
Adequate workspace exists around the RPP.
o
Adequate lighting is provided around the RPP.
o
A 120V service outlet is located within 7.5m (25 ft) of the RPP.
Summary of Contents for Remote Power Panel
Page 1: ...Eaton Remote Power Panel RPP User s Guide ...
Page 2: ......
Page 3: ...Eaton Remote Power Panel RPP User s Guide ...
Page 63: ......
Page 64: ... 164202125 3 164202125 5 ...