Figure 5-14A: The left side of the cabinet Figure 5-14B: The right side of the cabinet
is the positive side of the battery strings. is the negative side of the battery strings.
17. Use 36 battery shorting/jumpers to connect the terminals of the adjacent batteries on the positive side of the
battery cabinet (Figure 5-14A).
18. Use 36 battery shorting/jumpers to connect the terminals of the adjacent batteries on the negative side of the
battery cabinet (Figure 5-14B).
Figure 5-15A Figure 5-15B
19. Connect group 1 battery 10- to N battery bus bar (BAT N) (Figure 5-15A).
Note:
In steps 19 through 29, the cabinet diagrams show only the specific cable being referenced in each sequential step to avoid confu
-
sion with previously installed cables. However, each step is an accumulation of cable connections. Refer to the wiring connection diagram in
Figure 5-32 for details.
20. Connect group 1 battery 11+ to N battery bus bar (BAT N) (Figure 5-15B).
10 1
10 1
10 1
10 1
20 11
20 11
20 11
20 11
10 1
10 1
10 1
10 1
20 11
20 11
20 11
20 11
10#
10#
Summary of Contents for Smart Online S3M BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Frente Capa 3 Capa 2 Capa 1 Atrás ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Avant Couche 3 Couche 2 Couche 1 Arrière ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...