72
6. Operation and Configuration of S3M UPS Models
and Battery Cabinets
Configurations for S3M10K-NIB, S3M15K-NIB, S3M20K-NIB UPS with No Internal Batteries
UPS with No Internal
Batteries
Battery
Cabinet
Qty. of
Battery
Cabinets
Step 1
Step 2
Step 3
Step 4
Step 5
Battery
Group
Battery
Number
Single
Battery
(Ah)
Capability
Max Charge
Current (A)
Aver Changing
Duration (min)
Time (minutes) to
Charge Batteries to
90% at 25°C
10-20kVA
S3M10K-NIB,
S3M15K-NIB,
S3M20K-NIB
BP240V09K
1
4
20
9
5.4
500
BP240V09K
2
8
20
9
10.8
500
BP240V40
1
1
20
40
6
500
BP240V40
2
2
20
40
12
500
BP240V40
3
3
20
40
18
500
BP240V40L
1
2
20
40
12
500
BP240V40L
2
4
20
40
20
600
BP240V40L
3
6
20
40
20
900
Configurations for S3M25K and S3M30K
Battery
Cabinet
Qty. of
Battery
Cabinets
Step 1
Step 2
Step 3
Step 4
Step 5
Battery
Group
Battery
Number
Single
Battery (Ah)
Capability
Chg. Cur.
Limiting
Coef. (C)
Aver Changing Duration
(min)
Time (minutes) to Charge
Batteries to 90% at 25°C
BP240V40
1
1
20
40
0.15
540
BP240V40
2
2
20
40
0.15
540
BP240V40
3
3
20
40
0.15
540
BP240V40L
1
2
20
40
0.15
540
BP240V40L
2
4
20
40
0.12
540
BP240V40L
3
6
20
40
0.08
999
Configurations for S3M50K
Battery
Cabinet
Qty. of
Battery
Cabinets
Step 1
Step 2
Step 3
Step 4
Step 5
Battery
Group
Battery
Number
Single
Battery (Ah)
Capability
Chg. Cur.
Limiting
Coef. (C)
Aver Changing Duration
(min)
Time (minutes) to Charge
Batteries to 90% at 25°C
BP240V40
1
1
20
40
0.15
540
BP240V40
2
2
20
40
0.15
540
BP240V40
3
3
20
40
0.15
540
BP240V40L
1
2
20
40
0.15
540
BP240V40L
2
4
20
40
0.15
540
BP240V40L
3
6
20
40
0.15
540
Summary of Contents for Smart Online S3M BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Frente Capa 3 Capa 2 Capa 1 Atrás ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Avant Couche 3 Couche 2 Couche 1 Arrière ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...