2 Installation
2.9 Wiring in accordance with EMC requirements
20
SmartWire-DT Gateway EU5C-SWD-DP
01/13 MN120001Z-EN
www.eaton.eu
2.9 Wiring in accordance with EMC requirements
Undesired faults can occur on the field bus due to electromagnetic interfer-
ence. This can be minimized beforehand by the implementation of suitable
EMC measures. These include:
•
EMC-conformant system configuration,
•
EMC compliant cable routing,
•
Measures designed to reduce potential differences
•
the correct installation of the field bus system
(cable, connection of the bus connectors, etc.),
•
Using shielding
Figure 14:
Field bus shielded by using a shield
for top-hat rail
for mounting plate
M4
ZB4-102-KS1
ZB4-102-KS1
FM 4/TS 35
(Weidmüller)
KLBü 3-8 SC
(Weidmüller)