14
System Parallel Module
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 4-4).
7. Roll the cabinet to the final installation location.
8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise, recycle the
pallet, ramp, and shipping brackets in a responsible manner.
9. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
10. If permanently mounting the system, proceed to Step 11;
11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front and
rear of the UPS cabinet with the angle facing outward (see Figure 4-1 and Figure 4-3).
12. Secure the cabinet to the floor with customer-supplied hardware.
figure 4-1 . removing the front Shipping Bracket
figure 4-2 . Attaching the ramp to the Pallet
figure 4-3 . removing the rear Shipping Bracket
figure 4-4 . rolling the Cabinet down the ramp
Rear Shipping Bracket
Shipping Bracket Bolts
Shipping Bracket Bolts
Front Door
Leveling Feet
Ramp (side panel from wood container)
SPM Cabinet
Pallet
Rear Shipping Bracket
Shipping Bracket Bolts
Shipping Bracket Bolts
Leveling Feet
Summary of Contents for SPM 120
Page 1: ...System Parallel Module Installation and Operation Manual Eaton UPS Accessories...
Page 2: ......
Page 25: ...19 System Parallel Module Notes...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ...614 01728 00...