12
System Parallel Module
While waiting for installation, protect the unpacked cabinet from moisture, dust, and
other harmful contaminants. Failure to store and protect the SPM properly may void
your warranty.
NOTE
5. Recycle the remainder of the outer shipping container and the inner protective packaging in a responsible
manner.
6. Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.
If damage has occurred or shortages are evident, contact an Eaton service representative immediately to
determine the extent of the damage and its impact on further installation.
figure 3-3 . SPm Cabinet as Shipped on Pallet (wood container removed)
3 .4
Breaker location
figure 3-4 . Breaker location
Maintenance Isolation Switch
Maintenance Bypass Switch
Input Breaker-1
Input Breaker-2
Input Breaker-3
Input Breaker-4
Summary of Contents for SPM Series
Page 1: ...System Parallel Module Installation and Operation Manual Eaton UPS Accessories...
Page 2: ......
Page 25: ...19 System Parallel Module Notes...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ...614 01728 00...