6
3. Installation
It is recommended to move the equipment to the installation site by using a
pallet jack or a truck before unpacking.
The system may be installed only by qualified electricians in accordance with
applicable safety regulations.
The cabinet is heavy, please install it with at least two peoples.
3.1 Inspecting the equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file a
claim for shipping damage. If you discover damage after acceptance, file a claim
for concealed damage.
3.2 Unpacking the Unit
Unpacking the unit in a low-temperature environment may cause
condensation occurred in and on the cabinet. Do not install the unit until
the inside and outside of the unit are absolutely dry (hazard of electric
shock).
Remove the packing materials and lift the unit out with two people at least.
Tower 6KS/10KS
Tower 6K/10K
Tower EBM
Summary of Contents for Tower 6KS
Page 1: ...Eaton 9E IN User Manual Tower 6 10K...
Page 9: ...3 2 Presentation 2 1 Front panel Tower model Tower UPS 6KS 10KS Tower UPS 6K 10K Tower EBM...
Page 11: ...5 2 3 Circuit diagram...
Page 34: ...28...
Page 36: ...30...