103
Appendix C: Location plan for the luminaires
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
Date: ______________________
Decice address:
________________________________________________
Time:
______________________
Name of the system: ________________________________________________
Luminaire
20
Luminaire
10
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
19
Luminaire
9
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
18
Luminaire
8
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
17
Luminaire
7
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
16
Luminaire
6
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
15
Luminaire
5
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
14
Luminaire
4
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
13
Luminaire
3
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
12
Luminaire
2
Switch 1
Switch 1
Switch 2
Switch 2
Luminaire
11
Luminaire
1
Switch 1
Switch 1
Switch 2
Switch 2
Circuit name: ______________________________
Switch 1: __________________________________
Switch 2: __________________________________
Monitoring mode: ___________________________
Installed wattage [W]: _______________________
Installed load [VA]: __________________________
Appendix C: Location plan for the luminaires