28
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
4 Construction and Function
4.1 Example of Control Cabinet-Construction
(ZB-S/26)
Cable infeed from above
Triple deck tension spring
installation terminal with
neutral wire
disconnect terminal
Control unit CU CG-S
Batterie Control Modul
BCM
DC/DC converter.2
Circuit modules23 x SKU
Mains circuit breaker
Mains distribution box
(optional)
Battery circuit breaker
Battery distribution box
(optional)
Cable infeed from below
Charge module
CM 1.7 A (max. 2
modules)
Circuit modules
3 x SKU
Charge module CM 3.4 A
(max. 6 modules)
Leitungseinführung von oben
Dreistock Zugfeder Installationsklemme
mit Neutralleitertrennklemme
Lademodul CM 1,7 A (max. 2 Module)
Steuerteil CU CG-S
DC/DC Wandler.2
Stromkreismodule
3 x SKU CG-S 2 x 3 A
Batterie Control Modul BCM
Stromkreismodule
23 x SKU CG-S 2 x 3 A
Sicherungstrenner Netz
g
Rangierverteiler Netz (optional)
Sicherungstrenner Batterie
Lademodul CM 3,4 A (max. 6 Module)
Rangierverteiler Batterie (optional)
Leitungseinführung von unten
g
g