8 Installation
8.6 Wiring in accordance with EMC requirements
58
XN-312-GW-EC gateway
07/20 MN050010-EN Eaton.com
•
Use the XN300-Assist planning and commissioning software to run real-
time diagnostics on the system bus
•
Updating the operating system with XN300-Assist.
You can use any of the following programming cables:
USB 2.0 cable: Mini-B connector <-> Type A connector
8.6 Wiring in accordance with EMC requirements
Undesired faults can occur due to electromagnetic interference. This can be
minimized beforehand by the implementation of suitable EMC measures.
These include:
•
EMC-conformant system configuration,
•
EMC compliant cable routing,
•
Measures designed to reduce potential differences
•
the correct installation of the field bus system
(cable, connection of the bus connectors, etc.),
•
Using shielding
Figure 29:
Field bus shielded by using a shield
The gateway features a functional earth contact point on the back.
Figure 30:
XN-312-GW-EC side view
a
Functional earth
for DIN-rail
M4
ZB4-102-KS1
FM 4/TS 35
(Weidmüller)
①