6 Application example: XNE gateway with an Allen Bradley PLC
6.5 Configuration of the network in "RSLogiX 5000"
166
XI/ON: XNE-GWBR-2ETH-IP
09/2011 MN05002007Z-EN
www.eaton.com
6.5.3
Downloading the I/O configuration
If the configuration of the network is completed, it can be downloaded to the controller by
using for example the "Communication
→
Download" command.
In the "Download" dialog box, start the download by pressing the "Download" button.
If an error message is generated, warning, that the communication path can not be found,
please open the "Path" menu (see Figure 62: Communication Path, Page 166), select your
controller and press "Set Project Path" (see Figure 63: Communication Path, Page 167).
Figure 59:
Downloading
the configura-
tion
Figure 60:
Downloading
the configura-
tion
Figure 61:
Error message
Figure 62:
Communication
Path