5. Commissioning
5.2 Running the XP-504
5.2 Running the XP-504
Once the XP-504 has been initially commissioned, it will run whenever it is connected
to the power supply.
In other words, it does not have to be separately switched on and off.
Reducing the level of brightness will increase the display back-
light's lifespan.
If the Panel-PC or Box-PC will not boot, and/or an error message
appears, follow the instructions in the → Section "Faults", page 99
section.
XP-504
04/2022 MN048028EN Eaton.com
85
Summary of Contents for XP-504-10-A10-A01-2B
Page 1: ...Manual 04 2022 MN048028EN XP 504 Manual...
Page 4: ......
Page 86: ...5 Commissioning 5 2 Running the XP 504 86 XP 504 04 2022 MN048028EN Eaton com...
Page 98: ...7 Operating System 7 2 Windows 10 Enterprise LTSC 98 XP 504 04 2022 MN048028EN Eaton com...
Page 100: ...8 Faults 100 XP 504 04 2022 MN048028EN Eaton com...
Page 130: ...Appendix A 2 Further usage information 130 XP 504 04 2022 MN048028EN Eaton com...