INSTALLATION
All following procedures must be carried
out by qualified technical staff.
Installation
Filtered water is graded as a food and the
installation process, carried out by our
own technicians, conforms to the Health
and Safety Executive’s method and risk
assessment procedure for installing
filtration systems.
The system, once installed must not be
moved or altered in any way without the
written permission of Classeq, acting on
behalf of Eau de Vie. The new site is
subject to survey and any subsequent
removal or re-installation of the
equipment is to be carried out by Eau de
Vie. Charges will apply.
POSITIONING THE MACHINE
Wear gloves when moving the machine.
Pay attention as some parts may have
sharp edges.
Install the machine away from heat
sources.
Leave a space of at least 10cm between
the wall and the machine to allow
adequate ventilation.
16