background image

EAU FLOW 505

FOR HELP & ADVICE, PLEASE EMAIL 

technical@cleancert.co.uk

 OR CALL

 08443 511115

Installation

1.  Connect up all components as shown on the ‘Fitting Instructions’ sheet. 
2.  Ensure valve on top of storage tank is in ‘off’ position (90 degrees to tubing) 

and dispensing point (valve or tap) is ‘open’.

3.  Connect the electricity and water supply to the RO and turn on.
4.  Allow water to flush through cartridges and run from dispensing point  

(valve or tap) for 5 minutes down the drain.

5.  Now close the dispensing point (valve or tap) and open the valve on top of 

storage tank (inline with tubing)

6.  Allow storage tank to fill  

(around 45 minutes for a 12L tank, 60 mins for 20L, 90 mins for 40L)  

7.  Do not use first tank of water- allow to run down drain by opening 

dispensing point (valve or tap)

8.  Allow tank to refill - system is ready for use.

Mains Connection Diagram

Double check valve

Appliance tap

Washer

1/4” Pipe supplied

3/4” BSP thread

15mm cold water supply

15mm copper pipe (not supplied)

Connection and filling

Summary of Contents for 505

Page 1: ...05 Hard Water code EY5505HW Installation Manual Thank you very much for selecting an Eau Flow In order to bring the out best use of your system please read this instruction manual carefully before ins...

Page 2: ...return valve EY20110 B Appliance tap EY20111 C to BSP x3 EY20112 D 6 2mm tube 10m EY20008 E RO unit EY5505HW F Tank ball valve EY20127 G Storage tank 12L EYST12 H T Piece Push fit EY20123 I Dispensing...

Page 3: ...2 has any plumbing deadlegs in the plumbing between the stop cock in the road and the RO unit plumbing point Failure to observe these conditions will result in bacterial contamination of your RO syst...

Page 4: ...ges and run from dispensing point valve or tap for 5 minutes down the drain 5 Now close the dispensing point valve or tap and open the valve on top of storage tank inline with tubing 6 Allow storage t...

Page 5: ...intenance The following periodic maintenance is recommended so your system will provide an uninterrupted supply of purified water HARD WATER areas 250ppm CaCO3 please ensure you add a post RO blue dei...

Page 6: ...than 9 months since you changed cartridges then you need an additional blue Di cartridge EY30810 plus inline TDS meter EY20155 between RO and dispensing valve tap Contact your rep for details Power l...

Page 7: ...ion and needs removing We recommend MONTHLY testing of the water dispensed from your RO unit with a TVC total viable count dipslide to check whether bacteria has grown inside the RO unit In the unlike...

Reviews: