background image

Operating instructions

A3GZ50-AB02-35

Translation of the original operating instructions

With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.

;

Use the device in accordance with its degree of protection.

Information on surface quality

The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. This does not however in any way affect the
technical properties of the products. The product is to be protected against
UV radiation to prevent the formation of patches and fading. Changes in
color are not a reason for complaint and are not covered by the warranty.

3.5 Mounting data

;

Secure the screws against unintentional loosening (e.g. use self-
locking screws).

Strength class of
screws

10.9

Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.

3.6 Transport and storage conditions

Max. permitted
ambient temp. for
motor (transport/
storage)

+80 °C

Min. permitted
ambient temp. for
motor (transport/
storage)

-40 °C

3.7 Electromagnetic compatibility

If several devices are connected in parallel on the supply side
so that the line current of the arrangement is in the range 16 - 75
A, this arrangement conforms to IEC 61000-3-12, provided that
the short-circuit power S

sc at the connection point of the

customer system to the public power grid is greater than or
equal to 250 times the rated output of the arrangement. It is the
responsibility of the installation engineer or operator/owner of the
device to ensure, if necessary after consultation with the
network operator, that this device is only connected to a
connection point with an S

sc value greater than or equal to 250

times the rated output of the arrangement.

4. CONNECTION AND STARTUP

4.1 Mechanical connection

NOTE
Imbalance

Shortened service life for device
→ Do not grasp or transport the device by the blades.

Move the device with a crane using ropes or cloth straps.

→ Ensure after installation that the impeller moves easily

and that its blades are not deformed or bent and do not
scrape anywhere.

CAUTION
Cutting and crushing hazard when removing fan from
packaging

→ Carefully remove the device from its packaging, grasping it

by only the blades near the hub. Strictly avoid shocks.

→ Wear safety shoes and cut-resistant safety gloves.

CAUTION
Device weighs over 25 kg! Heavy load when unpacking
device.

Risk of physical injury, such as back injuries.
→ Use suitable hoisting equipment to remove the device from

its packaging.

CAUTION
The blades of the impeller could be damaged.

→ Carefully set down the fan on a soft surface. Make sure the

blades are not subjected to load. #Following installation,
make sure the impeller moves easily and that the blades of
the impeller are not deformed or bent and do not catch at any
point.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ The fan must not be subjected to force or excessive vibration

from sections of the installation. #If the fan is connected to air
ducts, the connection should be isolated from vibration, e.g.
using compensators or similar elements. #Ensure stress-free
attachment of the fan to the substructure.

;

Check the device for transport damage. Damaged devices are not to
be installed.

;

Install the undamaged device in accordance with your application.

CAUTION
Possible damage to the device

If the device slips during installation, serious damage can result.
→ Ensure that the device is securely positioned at its place of

installation until all fastening screws have been tightened.

The fan must not be strained on fastening.

Item no. 51475-5-9970 · ENU · Change 99339 · Approved 2018-04-26 · Page 6 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for A3GZ50-AB02-35

Page 1: ...ecialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated w...

Page 2: ...machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropria...

Page 3: ...ming all maintenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and storage...

Page 4: ...ce for screw 25 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Cable diameter min 9 mm max 16 mm tightening torque 6 0 9 Nm 5 Tightening torque 3 5 0 5 Nm Item no 51475 5 9970 ENU...

Page 5: ...iciency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 65 kg Size 1250 mm Motor size 200 Rotor surface Painted...

Page 6: ...a connection point with an Ssc value greater than or equal to 250 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connection NOTE Imbalance Shortened service life fo...

Page 7: ...t AWG 26 0 13 mm Protective earth contact resistance according to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit must...

Page 8: ...ed in Route the wire s not included in scope of delivery into the terminal box First connect the PE protective earth Connect the wires to the corresponding terminals Use a screwdriver to do so When co...

Page 9: ...meter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 8 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of a...

Page 10: ...onics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 S...

Page 11: ...power supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device fro...

Page 12: ...ns can destroy the fan In this case switch off the fan immediately and clean it If heavy corrosion is identified on load bearing or rotating parts of the unit switch it off without delay and replace i...

Page 13: ...knowledge The product is to be disassembled into suitable components for disposal employing standard procedures for motors WARNING Heavy parts of the product may drop off Some of the product component...

Reviews: