background image

Operating instructions

D4E240-BA01-01

Translation of the original operating instructions

4.4 Connection diagram

TOP

2x gray

U1

blue

Z

brown

U2

black

PE

green/yellow

Item no. 12547-5-9970 · ENU · Change 98149 · Approved 2018-07-24 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for D4E240-BA01-01

Page 1: ...ed by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installati...

Page 2: ...ng installation appropriate shielding measures have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire set...

Page 3: ...s Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Reson...

Page 4: ...CAL DATA 3 1 Product drawing All dimensions in mm 1 Cable ETFE AWG18 6x crimped splices Item no 12547 5 9970 ENU Change 98149 Approved 2018 07 24 Page 4 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Page 5: ...ith customer connection of protective earth Motor capacitor according to EN 60252 1 in safety protection class S2 Conformity with standards EN 60034 1 2010 Approval CCC EAC With regard to cyclic speed...

Page 6: ...nnections CAUTION Voltage The device is a built in component and has no disconnecting switch Only connect the device to circuits that can be switched off with an all pole disconnection switch When wor...

Page 7: ...pter 4 4 Connection diagram 4 3 1 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect the de...

Page 8: ...s 4 4 Connection diagram TOP 2x gray U1 blue Z brown U2 black PE green yellow Item no 12547 5 9970 ENU Change 98149 Approved 2018 07 24 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Page 9: ...r device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at...

Page 10: ...al regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassemb...

Reviews: