background image

Operating instructions

G2E085-AA01-06

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

Item no. 14505-5-9970 · ENU · Change 202174 · Approved 2018-12-28 · Page 7 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for G2E085-AA01-06

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating dev...

Page 3: ...d be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the...

Page 4: ...CAL DATA 3 1 Product drawing All dimensions in mm 1 Cable PVC AWG20 4x crimped splices Item no 14505 5 9970 ENU Change 202174 Approved 2018 12 28 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Page 5: ...N 60335 1 CE Approval UL 507 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult eb...

Page 6: ...an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether...

Page 7: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 14505 5 9970 ENU Change 202174 Approved 2018 12 28 Page...

Page 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 14505 5 9970 ENU Change 202174 Approved 2018 12 28 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...n your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the volta...

Page 10: ...o the level of dust exposure 5 2 Safety inspection What to check How to check How often What action Contact protection cover for intactness or damage Visual inspection At least every 6 months Repair o...

Page 11: ...xternal rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires...

Reviews: