background image

Operating instructions

R2E190-RA18-96

Translation of the original operating instructions

4.4 Connection diagram

Note: High speed (step III); low speed (step I); the switch must interrupt the circuit on switching.

1

blue (N)

2

brown

3

yellow

4

Step 1 (white)

5

Step 2 (gray)

6

Step 3 (black)

7

L1

8

PE (green/yellow)

Item no. 16396-5-9970 · ENU · Change 100193 · Approved 2018-06-18 · Page 9 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for R2E190-RA18-96

Page 1: ...d otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electri...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating dev...

Page 3: ...ticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operati...

Page 4: ...w 5 mm 3 Cable PFA AWG20 3 1 Capacitor yellow splice 3 2 Capacitor brown splice 3 3 N blue splice 3 4 Step 1 white wire end ferrule 3 5 Step 2 gray wire end ferrule 3 6 Step 3 black wire end ferrule 3...

Page 5: ...sions in mm 1 Accessory part inlet ring 09576 2 4013 not included in scope of delivery Item no 16396 5 9970 ENU Change 100193 Approved 2018 06 18 Page 5 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Page 6: ...04 1 CSA C22 2 No 100 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst...

Page 7: ...e disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the informa...

Page 8: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 16396 5 9970 ENU Change 100193 Approved 2018 06 18 Page...

Page 9: ...the switch must interrupt the circuit on switching 1 blue N 2 brown 3 yellow 4 Step 1 white 5 Step 2 gray 6 Step 3 black 7 L1 8 PE green yellow Item no 16396 5 9970 ENU Change 100193 Approved 2018 06...

Page 10: ...AINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with d...

Page 11: ...l regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembl...

Reviews: