background image

Operating instructions

S4E500-AE03-01

Translation of the original operating instructions

Weld seams
for crack
formation

Visual inspection At least every

6 months

Replace device

Item no. 10420-5-9970 · Revision 82542 · Release 2014-05-08 · Page 11 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for S4E500-AE03-01

Page 1: ...Only authorised specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety h...

Page 2: ...ng hair loose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect...

Page 3: ...imbalance e g caused by dirt deposits or icing Operation in medical equipment with a life sustaining or lifesaving function Operation with external vibrations Moving solids content in flow medium Pai...

Page 4: ...e the unit mm 1 Direction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 0 3 Nm Item no 10420 5 9970 Revision 82542 Release 2014 05 08 Page 4 11...

Page 5: ...astic RAL9005 Number of blades 5 Blade angle 5 Direction of air flow V Direction of rotation Counter clockwise seen on rotor Type of protection IP 54 Insulation class F Humidity class F3 1 Mounting po...

Page 6: ...l pole disconnecting switch 4 2 1 Prerequisites Check whether the data on the type plate agree with the connection data and the data of the operating capacitor Before connecting the device ensure that...

Page 7: ...rap Fig 2 Fan installed lying flat cable routed as a water trap Fans installed in upright position When routing the cable ensure that the screwed cable glands are arranged at the bottom The cables mus...

Page 8: ...ns 4 4 Connection screen L U1 blue Z brown N U2 black PE green yellow TOP grey Item no 10420 5 9970 Revision 82542 Release 2014 05 08 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfi...

Page 9: ...that all screws and screwed cable glands are properly tightened 4 7 Switch on device The device may only be switched on if it has been installed properly and in accordance with its intended use includ...

Page 10: ...tage faulty Check mains supply voltage restore power supply Faulty connection De energise correct connection see connection diagram Thermal overload protector responded Allow motor to cool off locate...

Page 11: ...d seams for crack formation Visual inspection At least every 6 months Replace device Item no 10420 5 9970 Revision 82542 Release 2014 05 08 Page 11 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 7467...

Reviews: