background image

Operating instructions

W2S130-AA19-38

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Airflow direction "V"

2

Cable silicone 2x 0.5 mm²
2x splice

3

M4 screw for fastening ground connector

Item no. 10639-5-9970 · ENU · Change 207628 · Approved 2019-10-24 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for W2S130-AA19-38

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...ndstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or da...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...dimensions in mm 1 Airflow direction V 2 Cable silicone 2x 0 5 mm 2x splice 3 M4 screw for fastening ground connector Item no 10639 5 9970 ENU Change 207628 Approved 2019 10 24 Page 4 11 ebm papst Mu...

Page 5: ...EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use...

Page 6: ...tched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data Before connecting the device make sure the power supply ma...

Page 7: ...external leads Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 10639 5 9970 ENU Change 207628 Approved 2019 10 24 Page 7 11 ebm papst Mul...

Page 8: ...ons 4 4 Connection diagram L1 blue L2 brown TOP Thermal overload protector Item no 10639 5 9970 ENU Change 207628 Approved 2019 10 24 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfi...

Page 9: ...ain switch 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connectio...

Page 10: ...Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operate...

Page 11: ...omponents employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 10639 5 9970 ENU Change 207628 Approved 2019 10 24 Page 11 11 ebm pa...

Reviews: