background image

Operating instructions

W6D500-GJ03-01

Translation of the original operating instructions

3.2 Nominal data

Motor

M6D110-EF

Phase

3~

3~

3~

3~

Nominal voltage / VAC

400

400

400

400

Wiring

Δ

Y

Δ

Y

Frequency / Hz

50

50

60

60

Method of obtaining
data

ml

ml

ml

ml

Valid for approval/
standard

CE

CE

CE

CE

Speed (rpm) / min

-1

930

800

1050

800

Power consumption / W

270

190

380

250

Current draw / A

0.69

0.4

0.75

0.43

Max. back pressure / Pa

75

55

90

55

Min. ambient
temperature / °C

-40

-40

-40

-40

Max. ambient
temperature / °C

65

65

65

65

Starting current / A

2.5

2.3

Phase

3~

3~

Nominal voltage / VAC

480

480

Wiring

Δ

Y

Frequency / Hz

60

60

Method of obtaining
data

ml

ml

Valid for approval/
standard

CE

CE

Speed (rpm) / min

-1

1100

910

Power consumption / W

415

295

Current draw / A

0.78

0.45

Max. back pressure / Pa

100

70

Min. ambient
temperature / °C

-40

-40

Max. ambient
temperature / °C

65

65

Starting current / A

2.8

ml = Max. load · me = Max. efficiency · fa = Free air

cs = Customer specification · ce = Customer equipment

Subject to change

3.3 Data according to Commission Regulation (EU) 327/
2011

Actual

Req. 2015

01 Overall efficiency η

es

/ %

30.3

29.9

02 Measurement category

A

03 Efficiency category

Static

04 Efficiency grade N

40.4

40

05 Variable speed drive

No

06 Year of manufacture

The year of manufacture is specified on the
product's rating label.

07 Manufacturer

ebm-papst Mulfingen GmbH & Co. KG
Amtsgericht (court of registration) Stuttgart ·
HRA 590344
D-74673 Mulfingen

08 Type

W6D500-GJ03-01

09 Power consumption P

e

/ kW

0.25

09 Air flow q

v

/ m³/h

4225

09 Pressure increase total p

sf

/

Pa

71

10 Speed (rpm) n / min

-1

935

11 Specific ratio

*

1.00

12 Recycling/disposal

Information on recycling and disposal is
provided in the operating instructions.

13 Maintenance

Information on installation, operation and
maintenance is provided in the operating
instructions.

14 Additional components

Components used to calculate the energy
efficiency that are not apparent from the
measurement category are detailed in the
CE declaration.

*

Specific ratio = 1 + p

fs

/ 100 000 Pa

Data obtained at optimum efficiency level. The ErP data is determined using a motor-impeller

combination in a standardized measurement setup.

3.4 Technical description

Weight

14.5 kg

Size

500 mm

Motor size

110

Rotor surface

Painted black

Terminal box material

PP plastic

Blade material

Press-fitted sheet steel blank, sprayed
with PP plastic

Fan housing material

Sheet steel, galvanized and coated with
black plastic (RAL 9005)

Guard grille material

Steel, coated with black plastic (RAL
9005)

Number of blades

5

Airflow direction

V

Direction of rotation

Counterclockwise, viewed toward rotor

Degree of protection

IP54

Insulation class

"F"

Moisture (F) /
Environmental (H)
protection class

H2

Ambient temperature
note

Occasional start-up at temperatures
between -40°C and -25°C is permitted.
For continuous operation at ambient
temperatures below -25°C (such as
refrigeration applications), use must be
made of a fan design with special low-
temperature bearings.

Installation position

Shaft horizontal or rotor on bottom; rotor
on top on request

Condensation
drainage holes

On rotor side

Mode

S1

Motor bearing

Ball bearing

Touch current
according to IEC
60990 (measuring
circuit Fig. 4, TN
system)

<= 3.5 mA

Electrical hookup

Terminal box

Motor protection

Thermal overload protector (TOP) with
basic insulation

with cable

Axial

Item no. 10067-5-9970 · ENU · Change 223007 · Approved 2021-02-23 · Page 5 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · info1@de.ebmpapst.com · www.ebmpapst.com

Summary of Contents for W6D500-GJ03-01

Page 1: ... authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be ob...

Page 2: ... the fan 1 6 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the devic...

Page 3: ...following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the ...

Page 4: ...ction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm 4 Mounting holes for FlowGrid Item no 10067 5 9970 ENU Change 223007 Approved 2021 02 23 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 5: ...he operating instructions 13 Maintenance Information on installation operation and maintenance is provided in the operating instructions 14 Additional components Components used to calculate the energy efficiency that are not apparent from the measurement category are detailed in the CE declaration Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined...

Page 6: ...fully remove the device from its packaging by the fan housing Strictly avoid shocks Wear safety shoes and cut resistant safety gloves CAUTION Heavy load when unpacking device Risk of physical injury such as back injuries Two people should work together to remove the device from its packaging CAUTION The blades of the impeller could be damaged Carefully set down the fan on a soft surface Make sure ...

Page 7: ...quency drives residual current devices cannot provide personal safety while operating the device 4 2 3 Voltage control NOTE Current overshoots may occur if speed control is implemented by transformers or electronic voltage regulators e g phase control Depending on the type of installation of the device noise and vibration may also occur in the case of phase control Vibration can lead to bearing da...

Page 8: ... routing for fans installed upright 4 3 4 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect the device to circuits that can be switched off with an all pole disconnection switch When working on the device secure the system machine in which the device is installed so as to prevent it from b...

Page 9: ...ection Y Star connection L1 V1 blue L2 U1 black L3 W1 brown W2 yellow U2 green V2 white TOP 2x gray PE green yellow Item no 10067 5 9970 ENU Change 223007 Approved 2021 02 23 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 10: ... inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration ...

Page 11: ...nd replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed fo...

Page 12: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Reviews: