Operating instructions - SBU IO-Link
Page 37 of 50
F)
Test run after installation
F01
Test run
The SBU IO-Link delivered has been manufactured, factory-preset and tested for the technical data
specified in the order.
Nevertheless you must ensure the perfect function after full installation of the SBU IO-Link . Therefore, be
sure to carry out and document the following steps before commissioning.
Check that all components and connections have been mounted correctly and firmly.
Check the proper mounting of the SBU IO-Link on the pneumatic quarter turn actuator.
Danger to life due to high voltage.
Very serious injuries or death due to electrocution.
People could come into contact with live parts
The SBU IO-Link may only be connected by an electrician.
Carry out the test run only with the switch box closed.
DANGER
Danger due to uncontrolled start-up of the pneumatic quarter turn
actuator.
Very serious injuries due to incorrectly connected pneumatic quarter turn
actuator or uncontrolled start-up.
Very serious injuries due to being crushed, pulled in, caught up or trapped as
well as due to abrasion, grazing and cutting.
All components and connections must be checked before switching on the
pneumatic system.
DANGER
Danger due to incorrect adjustment or indication.
Serious damage to the SBU IO-Link during operation.
A false indication or feedback represents a hazard.
Make sure that the OPEN and CLOSED positions of the valves correspond to
the controller.
DANGER
Note.
Observe the adjustment and indication of the valve and actuator.
The setting of the CLOSED end stop of a new SBU IO-Link should not be
changed as long as the quarter turn actuator is in the CLOSED position.
Refer to the information in these operating instructions for readjustment.
INFO