background image

5) 

Should you find it necessary to service the plunger assembly (16), you can do so by removing the 

tension screw (16D).  Inspect all parts and replace as necessary. 

 

NOTE:    In  order  to  drive  the  pump  from  the  side  opposite  the  present  shaft  extension,  simply 
remove  the  valve  casing  from  the  crankcase  and  rotate  the  pump  180  degrees  to  the  desired 
position.  Be certain to rotate the seal case as well, so that the weep holes are down at the six o’clock 
position.  Change the oil fill and the oil drain plugs.  Refer to the repair instructions as necessary 
for the proper assembly sequence. 
 
 

Reassembly sequence of the ECHO Tec. high-pressure pump. 

 

1) 

Reassemble  plunger  (16)  and  the  connecting  rod  (15)  with  wrist  pin  (17).    Place  assemblies  in 

crankcase  (1).    Install  crankshaft  through  connecting  rods,  again  being  careful  not  to  bend  or 
otherwise damage the connecting rods. 

 
2) 

Replace left and right side bearings (12A and 12B), if they were removed from the crankshaft.  Be 

certain  the  bearings  are  pressed  all  the  way  onto  the  shaft  and  completely  into  the  crankcase. 
Replace radial shaft seal (11) bearing cover with sight glass (7 and 8) and crankcase cover with O-
ring (3 and 4). 

 
3) 

If  oil  seals  (19)  were  removed,  replace  with  seal  lip  towards  crankcase.    Lubricate  seal  before 

replacing. 

 
4) 

Replace  seal  case  (20)  with  O-ring  (21)  over  plungers.    Generously  lubricate  O-ring  and  oil  seal 

before reassembly.  Replace V-sleeve (23) over plunger. 

 
5) 

Generously  lubricate  V-sleeve  (23).    Assemble  spacer  and  V-sleeve  (23)  into  valve  casing  (26).  

Assemble weep return ring and pressure ring (25 and 24) over plungers.  Slide the valve casing over 
plungers  and  seat  firmly.    Replace  the  eight-socket  head  cap  screws  (34)  and  tighten  to  105  inch-
pounds in a crossing pattern. 

 
6) 

Replace the six O-rings (31) and the six-valve assemblies (32X). 

Replace  the  six  valve  plugs  with  O-rings  (32  and  33)  and  tighten  securely  with  a  22mm  socket 
wrench to 33 foot-pounds. 

 
7) 

Fill crankcase with 7.5 ounces / 0.22 ltr of non-toxic, non-detergent SAE 90 gearbox oil. 

 
 
 
 
 
 

 

Summary of Contents for Watermakers 500-PRO-1

Page 1: ...FEATURES 5 INSTALLATION INSTRUCTIONS 6 7 OPERATION INSTRUCTIONS 8 MEMBRANE CLEANING PROCEDURE 9 MAINTENANCE TIMETABLE 10 PRESSURE VESSEL ENDPLUG CHANGING PROCEDURE 11 ELECTRICAL DIAGRAM 12 TROUBLESHO...

Page 2: ...new ECHO Tec desalination system By understanding the function importance and normal operation of each part in the system the operator can readily diagnose problems when they first develop Such proble...

Page 3: ...jection TFC Polyamide thin film composite spiral wound single pass reverse osmosis element Salt Rejection min 99 5 Salinity Range System 500 900 up to 50 000 ppm TDS NaCl 1200 up to 40 000 ppm TDS NaC...

Page 4: ...els and 5 and 20 micron cartridge filtration system 2 1 Fresh water flush kit with hose and 316SS hose clamps 3 1 Product water tube 10ft 3m 1 Reject hose 10ft 3m with 2pcs 316SS hose clamps 1 Intake...

Page 5: ...e feed pump with the intake of the desalination system located at the pre filter assembly Secure all hoses with the supplied hose clamps PRODUCT WATER TUBING Connect the product water outlet marked SA...

Page 6: ...changes set the selector switch on the electrical control panel to the FEED position feed pump only and purge the system until all entrapped air has escaped 6 In the AUTO position press the START but...

Page 7: ...he seawater shut off valve and the seacock MEMBRANE STORAGE PROCEDURE If you intend to store your watermaker for more than ten days growth of microorganism will degrade the RO membranes performance Th...

Page 8: ...al scale remover See warning label on side of container and observe all safety precautions on label CAUTION Do not mix different cleaning chemicals together Do not use different cleaning chemicals tog...

Page 9: ...and clean intake 1000 hrs or when clogged Pre filters Replace or clean elements and clean housings When system intake pressure drops below 5psi Charcoal flush filter Replace element Every 6 months Hig...

Page 10: ...s inner wall and remove it in one fast pull 6 Inspect the end plug for hairline cracks or damages on the O rings and O ring grooves 7 Pull the membrane on the product pipe out of the pressure vessel o...

Page 11: ...TRANS FORMER START SWITCH S1 PUSH BUTTON NO SELECTOR SWITCH S2 3 POSITION MAINT 4 CONTACTS NO T1 HIGH PRESS SWITCH S4 NC LOW PRESS SWITCH S5 NO TANK FULL SWITCH S6 NC EXTERNAL MAIN IN ELECTRICAL DIAG...

Page 12: ...ns Check strainer and filter s Inability to Discharge valve chamber Allow more time to prime build up pressure has air trapped within it and ensure that there are no air suction leaks Open valve chamb...

Page 13: ...16B and copper gasket 16D and clean the old Locktite from the plunger bolt 16C and plunger base 16A Replace the plunger with the new one and Locktite the plunger bolt and torque to 120 inch pounds NOT...

Page 14: ...s 12A and 12B if they were removed from the crankshaft Be certain the bearings are pressed all the way onto the shaft and completely into the crankcase Replace radial shaft seal 11 bearing cover with...

Page 15: ......

Page 16: ...ned to Echo Marine s Service Center The purchaser must pay any transportation or labor expenses incurred in removing and returning the product to the service center The limited warranty does not exten...

Page 17: ...ranteed against iron fouling rust chemical attack extreme temperatures over 113 F under 33 F drying out or extreme pressures over 1000 psig CAUTION Use of parts not supplied directly by Echo Marine ge...

Reviews: