A. Log Splitter Frame …………........
..
........1 set
B. Control Lever and Guard Assy............ 2 sets
C. Removable Support Table.....................1 pc
D. Owner’s Manual ……….....…..................2 pcs
Pull Spring Pin (A) to remove the Lock Pin (B).
Apply a thin coat of grease to both surfaces of
the Control Lever Guard as illustrated. Insert
the Control Lever and Guard Assy and make
sure the Control Lever End goes into the slot
of Connection Bracket (C). Lock the Control
Lever and Guard Assy, down with the Lock Pin
(B) and Spring Pin (A). Follow the same steps
to install the other Control Lever and Guard
Assy on the other side.
Three installation positions are available for
the Support Table for different splitting length.
At every installation position, Lock Down Hooks
(D) are available. Insert the Support Table in
the selected Brackets (E). Turn the Lock Down
Hooks (D) on both sides by 90 degrees to lock
the Support Table down.
8
A
B
C
D
CONTENTS OF THE
SHIPPING CONTAINER
SET UP AND PREPARATION
FOR OPERATION
FOR YOUR SAFETY
READ AND UNDERSTAND THE ENTIRE MANUAL
BEFORE OPERATING MACHINE
MODEL NUMBER : C070
SERIAL NUMBER :
Both model number and serial number may be found on the main label .
You should record both of them in a safe place for future use.
Save This Manual for Future Reference
7 T
ON VERTICAL
LOG SPLITTER
Owner’s Manual