9
PAS T
RIMMER
A
TTACHMENT
O
PERATOR
'
S
M
ANUAL
PLASTIC
SHIELD
INSTALLATION
(For Nylon Line Operation)
Tools Required: Screwdriver.
Parts Required: Plastic Shield, Shield Plate, three (3) 5 mm x 15 mm
screws.
NOTE
The plastic shield is for use with the Nylon Line Head only.
1. Snap the shield on the bottom of the bearing housing flange.
2. Place shield plate on shield, align holes and install three (3) screws.
A
B
C
NYLON
LINE
HEAD
INSTALLATION
Tools Required: Head Locking Tool
Parts Required: Nylon Line Head.
1. Align locking hole in upper plate (B) with notch in edge of gear
housing and insert head locking tool (A).
2. Remove plastic sleeve from P.T.O. shaft (C).
3. Be sure upper plate (B) remains on P.T.O. shaft.
4. Thread line head onto P.T.O. shaft by turning it counter clockwise
until head is tight against upper plate (B).
5. Remove locking tool (B).