13
P
ower
B
lower
o
Perator
'
s
M
anual
PB-755T
WARNING
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.
InsTall
bloWer
pIpes
1. Place guide loop (G) across elbow clamp, and turn until clips
fully engage clamp band.
2. Assemble clamps (A) onto both ends of flexible pipe (B).
NOTE
Clamp with cable guide loop (G) fits elbow end of flexible pipe.
3. Assemble swivel pipe (C) into flexible pipe (B).
NOTE
Assure throttle cable is not twisted before installing handle (E).
4. Position cable between the elbow (D) and frame and along the top
of the flexible pipe. Loosen knob (H) on handle (E). Align notch
in handle with tabs (F). Install onto swivel pipe (C) past long
ridges in pipe.
5. Assemble flexible pipe (B) to elbow (D) on blower and tighten
clamps (A). Position guide loop (G) on inside (blower side) of
flexible tube.
NOTE
A light lubricant may be used to ease assembly of flexible pipe to
blower elbow.
6. Clip throttle cable into throttle cable guide loop (G).
7. Move handle (E) to desired position. Tighten knob (H) hand tight.
8. Assemble straight pipe (I) onto swivel pipe (C), until you feel
light resistance. Do not force connection. Hold swivel pipe and
turn straight pipe clockwise, engaging positive locking channels,
until connection is firm. Do not force connection.
9. Assemble straight pipe with decal (J) to straight pipe (I) as in step
8.
NOTE
Blower use will eventually loosen pipe connections. Exclusive
positive locking system allows pipes to be tightened. If loosening
occurs, remove two straight pipes and install according to instruc-
tions 8 & 9.
e
I
J
C
e
B
H
F
D
G
e
H
G
A
A
B
G
C
G
Summary of Contents for PB-755T
Page 29: ...29 Power Blower Operator s Manual notes ...
Page 30: ...30 notes ...