G
RASS
T
RIMMER
/B
RUSH
C
UTTER
O
PERATOR
'
S
M
ANUAL
13
U
-
HANDLE
INSTALLATION
Tools Required: 19 mm wrench, 4 mm hex wrench, Pliers
Parts Required: U-Handle, Clamp w/screws, 8 mm x 55 mm hex bolt,
8 mm flat washer
1.
Install upper U-Handle and bracket on lower bracket with one (1)
8mm x 55mm bolt (A) and (1) large circular washer. Do not tighten
bolt securely until final adjustments are completed.
2.
Loosen upper (2) U-handle clamp screws (B), and position U-
handle as shown.
3.
Lightly tighten 8mm bolt (A) and clamp screws (B) to hold U-handle
in position until final adjustments are completed.
4.
Route throttle linkage and ignition lead assembly along shaft and
clip as shown.
THROTTLE
LINKAGE
AND
IGNITION
LEADS
1.
Place throttle linkage (C) through adjustment fixture (D) and install
wire end into large carburetor throttle swivel hole (E). Check throttle
for freedom of movement and that wide open throttle / low idle
extremes are adjusted properly. The throttle linkage must be
adjusted by moving the adjustment fixture (D). Consult with your
Echo Dealer for correct adjustment procedure.
2.
Connect ignition leads (F) and (G).
3.
Install throttle linkage into bracket clamp (H) and pinch snug with
pliers. Bend bracket up and flush against drive shaft.
F
G
C
D
A
B
E
H