|
40
MN300820 Rev B4
Installation (continued)
Step
Five
3. Flange:
If installing on a flange, select a flange with a thread that is above the plane of the flange,
such as the LM52-2850.
a. Use a flange with a 3” thread and add a 3” to 2” reducer bushing to complete the installation.
2” Flange w/
(LM52-2850)
3” Flange w/ Reducer Bushing
(LM52-3800)
3” Flange
(LM52-3850)
4.
Side Mount Bracket:
For installations in open tanks and sumps, use the LM50-1001 series side
mount bracket.
LM50-1001 Shown
Note:
The Side Mount Bracket (LM50 series) is not designed for use with stand pipes or as a
method to secure stand pipes. There are too few threads to properly hold the sensor and the
stand pipe.