8
1
SW
o
Synchronization of cloud content (Cloud Disk Sync): compatible with
Google Drive service
o
Execution of scripts (user-written instruction files in lua language -
www.lua.org).
o
Local file encryption (USB/MICRO SD)
o
Activity Log
PLAYER ZERO programming is done through the web application embedded in
the unit.
Refer to the
PLAYER ONE & PLAYER ZERO web GUI
information.
3.
INSTALL & CONNECT
3.1
LOCATION, SET UP AND VENTILATION
The PLAYER ZERO has been
specially designed to be used both as a desktop player and
a 19" rackmount unit
, occupying third a rack space (with
, optional
mounting kit for standard rack cabinets).
In professional installations, it
should preferably be placed in the same rack as the audio
sources
.
Since its
power consumption is very low, forced ventilation is not necessary. However,
avoid exposing the device to extreme temperature and the environment in which it is
placed should be as dry and clean (no dust) as possible.
3.2
AC CONNECTION AND POWERING ON
PLAYER ZERO is powered by alternating current (AC) through its external power supply:
100-240 VAC, 50-60 Hz. This external power supply has several interchangeable
connectors: American, European, British and Chinese.
The operating environment should be dry and be totally free of dust. Do not expose the
unit to dripping or splashing. Do not place incandescent objects like candles on top of it.
If the unit requires any intervention and/or connection/disconnection, it must be powered
off first. There are no user-serviceable parts within the unit. To avoid buzzing, do not allow
the power cable to intertwine with audio shielded cables.