INSTALLATION, OPERATION AND MAINTENANCE MANUAL
5
Introduction
1.
The boiler and all associated equipment must be installed and used in accordance with the installation design, all applicable
legal regulations and technical standards and with the manufacturer’s instructions. The boiler may be used only for the purpose
for which it is intended.
2.
The boiler may be installed only in an environment which it is designed for.If the boiler is delivered to the client by the same
person who installs it, he must give the user also all accompanying boiler documentation (in particular User Guide, Service Book,
etc.). Until the boiler is put into service, the original packaging must be kept in case the boiler has to be transported again.
3.
After installation, the boiler must be put into operation by a service organisation authorised by the manufacturer.
4.
The boiler complies with regulations applicable in the European Union. When used in the conditions of countries outside at
EU, any deviations from local regulations must be identified and rectified.
5.
In the event of a defect, call an authorised manufacturer’s service organisation – any unauthorised interference may damage
the boiler (and possibly also associated equipment!).
6.
The service technician putting the boiler into operation for the first time must show the user the various parts of the boiler and
how to control the boiler, with the boiler safety elements, their signals and appropriate user reaction to them, with fundamental
parts of the boiler and their controls. If the boiler is delivered to the client by the same person who installs it, he must make
sure that the original packaging is available in case the boiler has to be transported again.
7.
Check the delivery for completeness.
8.
Check whether the model and type supplied is suitable for the required use.
9.
Whenever you are not certain how to control the boiler, study appropriate instructions in this Operation and Installation Guide
carefully and proceed accordingly.
10. Never remove or damage any markings and signs on the boiler. Keep the original packaging until the boiler has been put
into service, in case the boiler has to be transported again.
11. When making any repairs, only original parts must always be used. It is forbidden to make any changes to the boiler’s internal
installation, or to interfere with it in any way.
12. At the end of its life cycle, the boiler its package and its parts must be disposed of in a way avoiding harm to the environment.
13
The manufacturer disclaims any responsibility for damages caused by the failure to abide by:
■
The conditions stipulated in this Operation and Installation Guide
■
Applicable regulations and standards;
■
Sound installation and operation procedures; and
■
Conditions stated in the Warranty Certificate and the Service Book.
Situations might occur in practice, when the following essential precautions must be taken:
■
Shut the boiler down every time when there are any (even temporary) flammable or explosive fumes present on the premises
from which combustion air is supplied to the boiler (e.g. from paint when painting, laying and spraying molten substances,
from gas leakage, etc.);
■
If it is necessary to drain water from the boiler or from the whole system, the water must not be dangerously hot; and
■
If there is any leakage from the boiler’s heat exchanger, or when the exchanger is clogged up with ice, do not attempt to
start up the boiler until normal operating conditions have been restored.
Ensuring safety of equipment and people
■
The boiler (and all accessories) complies with the requirements of EN 303-5 its updates and all relevant European standards.
■
In order to run and operate the boiler in accordance with the purpose for which it is designed in actual conditions of use
(hereafter referred to only as use), it is necessary to abide also by additional requirements the most essential ones of which
(i.e. those which must not be omitted) are found in the related regulatory documents.
■
In addition to the above mentioned documents, it is necessary when using the boiler to proceed in accordance with this
Operation and Installation guide and the accompanying boiler manufacturer’s documentation.
■
Any interference by children, persons under the influence of narcotic drugs, certified persons, etc., when using the boiler, must
be prevented.