4.Connecting the discharge piping

•  Install a 2 in. PVC Schedule 40 threaded male adapter

  (1) (not included) into the discharge flange (2) as shown.

  Use Teflon tape, silicon sealant, or plumber’s pipe dope

  to seal the threads. Ensure that you are connecting to

  the sewage pump discharge and not the vent port.

•  Connect discharge pipe (3) (not included) to the 2 in.

  PVC Schedule 40 threaded male adapter (1) (not

  included) using PVC primer and solvent cement to

  properly seal the connection.

•  Install the 2 in. compression fit check valve (EFSWCV200)

  (C) to the discharge line at the appropriate location.

  Ensure the flow arrow on the check valve (C) is pointed

  in the right direction. Tighten fittings to ensure a

  watertight seal.

•  Install 2 in. PVC Schedule 40 pipe (4) (not included) into

  the 2 in. compression fit check valve (C) and connect this

  pipe to the appropriate sewer main pipe for discharge.

  Hand tighten the fittings to ensure a watertight seal.

5. Attaching the vent connection

•  Install a 2 in. PVC Schedule 40 threaded male adapter 

  (1) (not included) into the vent hole (2) as shown. Use 

  Teflon tape, silicon sealant, or plumber’s pipe dope to seal  

  the threads.

•  Connect a vent pipe (3) (not included) to the 2 in. PVC  

  Schedule 40 threaded male adapter (1) using PVC primer  

  and solvent cement to properly seal the connection. Connect  

  the vent pipe to the sewer’s vent system. We suggest that a  

  union be installed on this line to allow for easy pump service  

  or removal.

6. Connecting the power and verifying proper operation

•  Make sure that the cord grommet is properly inserted into  

  the lid. This assures a water and gas tight seal.

•  Check the pump by filling the basin with water and observe  

  the pump’s operation through one complete cycle.

INSTALLATION

5

For parts or assistance, call ECO-FLO Customer Service at 1-877 326-3561

Summary of Contents for ESE50WB1830

Page 1: ...Owner s Manual Pre Plumbed Sewage Basin System Features 2 3 Installation 4 5 Safety Information 6 7 Warranty 8 TABLE OF CONTENTS RSE50WB1830 ESE50WB1830...

Page 2: ...vy duty ABS slip fit flexible union check valve passes a full 2in solid Molded inlet hub comes with a stainless steel clamp for securing the inlet pipe Performance Gallon Per hour Float Switch Model 0...

Page 3: ...r with automatic reset thermal overload protection Ball bearings for quiet operation Handles 2 solids Easily replaceable 20 foot power cord Mechanical shaft seal for long life Support 400 lbs Sewage P...

Page 4: ...for pumps with a float cord and a 1 hole grommet for 1 cord systems Press the grommet B into the grommet hole 4 to provide a tight seal Secure the basin cover onto the basin with the basin cover fast...

Page 5: ...ve C and connect this pipe to the appropriate sewer main pipe for discharge Hand tighten the fittings to ensure a watertight seal 5 Attaching the vent connection Install a 2 in PVC Schedule 40 threade...

Page 6: ...t area until all power is turned off If shut off box is in basement call the electric company to shut off service to the house or call your local fire department for instructions Remove pump and repai...

Page 7: ...be submerged WARNING Do not use extension cords They are a fire hazard and can reduce voltage sufficiently to prevent pumping and or damage the motor WARNING Do not handle or service the pump while i...

Page 8: ...le No requests for service will be accepted if received more than 30 days after the warranty expires Warranty is not transferable and does not apply to products used in commercial rental applications...

Reviews: