E93.9950EN CB Cascade manual
3. Determine power required for the cascade configuration
The first step in the installation procedure for the cascade configuration is to determine the total power required
for the cascade configuration. This power is calculated based on the size of the room(s) to be heated and other
relevant variables. If the required power in kW is known, consult Table 3.1 (below) in order to determine which
combination of boilers can be applied to achieve the required power.
Total
Power *
CB 85 CH
CB 105 CH
CB 125 CH
CB 155 CH
Total number
boilers
Cascade type
170
2
2
CCB-170-2-2000
187
1
1
2
CCB-187-2-1100
204
2
2
CCB-204-2-0200
210
1
1
2
CCB-210-2-1010
227
1
1
2
CCB-227-2-0110
236
1
1
2
CCB-236-2-1001
249
2
2
CCB-249-2-0020
253
1
1
2
CCB-253-2-0101
255
3
3
CCB-255-3-3000
272
2
1
3
CCB-272-3-2100
276
1
1
2
CCB-276-2-0011
289
1
2
3
CCB-289-3-1200
295
2
1
3
CCB-295-3-2010
302
2
2
CCB-302-2-0002
305
3
3
CCB-305-3-0300
312
1
1
1
3
CCB-312-3-1110
321
2
1
3
CCB-321-3-2001
328
2
1
3
CCB-328-3-0210
335
1
2
3
CCB-335-3-1020
338
1
1
1
3
CCB-338-3-1101
340
4
4
CCB-340-4-4000
351
1
2
3
CCB-351-3-0120
355
2
1
3
CCB-355-3-0201
357
3
1
4
CCB-357-4-3100
361
1
1
1
3
CCB-361-3-1011
374
3
3
CCB-374-3-0030
374
2
2
4
CCB-374-4-2200
378
1
1
1
3
CCB-378-3-0111
380
3
1
4
CCB-380-4-3010
387
1
2
3
CCB-387-3-1002
391
1
3
4
CCB-391-4-1300
397
2
1
1
4
CCB-397-4-2110
400
2
1
3
CCB-400-3-0021
404
1
2
3
CCB-404-3-0102
406
3
1
4
CCB-406-4-3001
407
4
4
CCB-407-4-0400
413
1
2
1
4
CCB-413-4-1210
420
2
2
4
CCB-420-4-2020
423
2
1
1
4
CCB-423-4-2101
426
5
5
CCB-426-5-5000
427
1
2
3
CCB-427-3-0012
430
3
1
4
CCB-430-4-0310
436
1
1
2
4
CCB-436-4-1120