7 Installation
This furnace can be installed in up
fl
ow or horizontal orientations.
(see Section 7.3, Fig 13-18).
7.1 Up
fl
ow Installation
Bottom return air inlet
These furnaces are shipped with the bottom closure panel installed in bottom
return-air opening. Remove and discard this panel when bottom return air is used.
To remove bottom closure panel, perform the following:
1.
Tilt or raise furnace and remove the screw holding bottom
fi
ller panel. (See
Fig. 7.)
2.
Remove bottom closure panel.
Figure 7
BOTTOM CLOSURE PANEL
BOTTOM FILLER
PANEL
SCREW
SCREW
Removing bottom closure panel
Figure 8
Upflow Installation
Tilt the unit slightly (minimum 1/2
(12.7 mm) to maximum of 3/4 (19 mm))
from back to front to aid in the draining of the heat exchanger.
1/2”~3/4”
W
E
I
V
E
D
I
S
W
E
I
V
T
N
O
R
F
Up
fl
ow Application-Setting Equipment
Side return air inlet
These furnaces are shipped with bottom closure panel installed in bottom return-air
opening. This panel MUST be in place if only side return air is used.
Depending on the installation requirements, side return-air openings can
be used in UPFLOW and most HORIZONTAL con
fi
gurations.
These furnaces come standard with knockout holes to aid in right/left
return con
fi
gurations. To do this, knockout the holes and cut the sheet
metal and insulation accordingly.