1. Layout Array on Rooftop
Using chalk, layout the
footprint of the array on
the rooftop. Look for
any obstructions on the
rooftop that could
prevent a complete and
proper installation of
the array.
1. Starting from the
downhill edge,
place a mark 2-1/2"
up from the bottom
edge of the downhill
course of shingles.
2. Using the Module
dimensions include
the following:
Left/right include a
1/2" gap between
Modules.
Uphill/downhill
includes a
3/4" gap between
Modules.
The following page
continues this layout
and illustrates a finished
rooftop layout.
l
l
Knowing where the
Modules intersect
will identify potential
interferences between
Attachments and
Couplers.
Most AHJ’s require a
roof setback per
their local fire code
requirements. Make
sure that the required
setback is observed
when marking the
footprint of the array.
1a. Mark the Four Corners of Array
Mark Module
Intersections
Mark Footprint
of Array
Modules
Mark 2-1/2" up
from bottom edge
of downhill course
2-1/2"
3/4"
Gap
3/4"
Gap
1/2" Gap
1/2" Gap
Module
Width
Module
Width
4 of 31
EcoX Gen2 Installation Guide, Rev 1.11
Summary of Contents for EcoX
Page 1: ...EcoX Gen2 Installation Guide Rev 1 11 Installation Guide Gen2 ...
Page 31: ...EcoX Gen2 Installation Guide Rev 1 11 26 of 31 11 Grounding and Bonding cont ...
Page 32: ...EcoX Gen2 Installation Guide Rev 1 11 27 of 31 11 Grounding and Bonding cont ...
Page 33: ...EcoX Gen2 Installation Guide Rev 1 11 28 of 31 11 Grounding and Bonding cont ...