25
6 - COMBUSTION AIR AND VENT PIPING
6.6 Condensate Piping
Use materials acceptable to authority having jurisdiction.
•
In absence of such authority:
USA - PVC or CPVC per ASTM D1785/D2845 Cement
•
or primer per ASME D2564 or F493.
Canada - CSA or ULC certifi ed PVC/CPVC pipe,
•
fi ttings and cement.
Insert 1/2" (1.3 cm) PVC pipe through grommet in
•
chassis. See fi gure 6-1.
Attach PVC tee provided with boiler and fi eld sourced
•
piping to condensate drain vertical tee on left side of
boiler. See fi gure 6-1.
Slope condensate drain pipe minimum 1/4" per foot
•
(21mm/m) away from boiler.
Use condensate pump if boiler located below disposal
•
point. 120 VAC auxiliary power outlet can be used to
power condensate pump.
Field source condensate neutralizing kit as required
•
by authority having jurisdiction or for environmentally
friendly condensate disposal.
FIGURE 6-1 Condensate Drain
PVC Tee (fi eld installed)
on condensate drain
pipe
Summary of Contents for 075 97gb
Page 56: ...56 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Page 57: ...57 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Page 73: ...73 ...
Page 74: ...74 ...
Page 75: ...75 ...