43
VERIFICATION PROCEDURE AND ADJUSTMENT
IV. Measure new input rate (cover screw must be
installed). Repeat steps I.-IV until the input rate is
/-2% of the nameplate input rating.
V. If the actual input rate can not be set to within 2%
of the correct input rating by adjusting manifold
pressure, a change in gas ori
fi
ce size is required.
Consult the boiler manufacturer for information on
correct ori
fi
ce sizing. The speci
fi
c gravity (G) and the
higher heating value (HHV) of the local natural gas
must be obtained from the local gas utility in order to
determine the proper ori
fi
ce size.
Set Thermostat To Desired Room Temperature
Observe several operating cycles to verify proper operation.
Review All Instructions
Review all instructions shipped with this boiler with owner
or maintenance person. Instructions must be af
fi
xed on or
adjacent to the boiler.
Complete and sign the “Installation and Check-Out
Certifi cate” on page 62
.
Summary of Contents for Dunkirk 4 Series
Page 33: ...33 Figure 22 Ladder Diagram for Figure 22 ELECTRICAL WIRING ...
Page 52: ...52 Troubleshooting Chart 1 TROUBLESHOOTING ...
Page 53: ...53 Troubleshooting Chart 2 TROUBLESHOOTING ...
Page 63: ...NOTES ...
Page 64: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...