65
11.1 Beginning of Each Heating Season
• Check boiler area is free from combustible materials,
gasoline, and other flammable vapors and liquids.
• Visually inspect combustion air and vent piping for proper
operation. Check for and remove any obstruction to flow
of combustion air or vent gases. Immediately repair or
replace pipe showing deterioration or leakage. Reassemble
per instructions in section 6. Ensure proper reassembly and
resealing of system.
• Visually inspect condensate drain line for proper operation.
Checking for deteriorated or plugged condensate drain line.
Verify condensate trap drains freely and clean as required.
• Test safety relief valve for proper operation. Refer to valve
manufacturer's instructions packaged with relief valve.
• Examine flue passages in heat exchanger, burner,
condensate lines, and cleaning (if necessary) by following
instructions in “Annual Examination and Cleaning of Boiler
Components” in this section.
CAUTION
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation.
!
FIGURE 11-1 Sight Glass
DANGER
Before servicing, turn off electrical power to boiler
at service switch. Close manual gas valve to turn
gas supply OFF to boiler. Failure to comply will
result in death or serious injury.
!
Sight Glass
11 - GENERAL MAINTENANCE AND CLEANING
Note
Verify proper operation after servicing.
Note
Perform regular service and maintenance by
qualified service agency at least once every 12
months to assure safe, trouble free operation
and maximum efficiency.
P/N 240011664, Rev. E [09/15/2017]