7
3.1 Component Listing - Refer to diagrams on
following pages.
1.
User Interface
Displays information regarding boiler
condition. Allows adjustment of boiler operating
parameters. NOTE: Does not replace thermostat used
to control central heating space.
2.
Combustion Air Inlet (2"/3")
See section 6.
3.
Return Water From Heating System (In)
Connection supplied at bottom of boiler. See section 5.
4.
Low Voltage Terminal Strip
Low Voltage Terminal Strip
Connection of all low
voltage wiring, including thermostat.
5.
Igniter
6.
Flame Sensor
7.
Sight Glass
Permits observation of burner
fl
ame.
8.
Burner
(see page 40)
9.
Heat Exchanger
10.
Condensate Collector
11.
Return Water Temperature Sensor
12.
Drain Valve
(see page 14)
13.
Internal Primary Loop Ball Valve
14.
Supply Water Outlet to Heating System (Out)
Connections supplied for connecting from bottom of
boiler. See section 5.
15.
Vent Temperature Sensor
16.
Condensate Drain
Boiler produces a liquid
(condensate) as a by-product of combustion. Condensate
must be piped to appropriate drain. See section 6.
17.
Heat Exchanger Pump
Heat Exchanger Pump
18.
Gas Shutoff Valve
Gas Shutoff Valve
Fuel supply isolation during
Fuel supply isolation during
servicing. See section 7
servicing. See section 7
19.
Combustion Air Blower
Combustion Air Blower
Delivers proper quantity of
Delivers proper quantity of
combustion air, receives fuel from gas valve, mixes air
combustion air, receives fuel from gas valve, mixes air
and fuel sending mixture to burner for combustion.
and fuel sending mixture to burner for combustion.
20.
Gas (Control) Valve
Gas (Control) Valve
Delivers proper quantity of fuel
Delivers proper quantity of fuel
to Combustion Air Blower. See section 7.
to Combustion Air Blower. See section 7.
21.
Supply Water Temperature Sensor and High Limit
Supply Water Temperature Sensor and High Limit
Switch
Switch
22.
Low Water Cutoff
Low Water Cutoff
Senses inadequate quantity of
Senses inadequate quantity of
water. Turns off boiler before damage can occur.
water. Turns off boiler before damage can occur.
23.
Safety Relief Valve
Factory supplied, Field installed.
See section 5.
24.
High Voltage Junction Box
For connection of 120V
components. See section 88.
25.
Vent Connector
See section 6.
26.
Gas Connection
Gas Connection
See section 7.
See section 7.
27.
Wall Hanging Support Bracket
(see page 12)
Integral to boiler. Allows wall mounting when used
with supplied wall mounting bracket. See section 4.
28.
Air Vent
29.
Boiler Control Module
Boiler Control Module
30.
Lower Jacket Panel
Gently pull upward then forward
to access.
31.
Transformer
Supplies 24V power to low water cutoff.
32.
Flue Air Mixture Pressure Test Port
- Not available
on all models.
33.
Combustion Analysis Test Port
34.
Internal Pump Relay -
Not available on all models.
35.
Heat Exchanger Surface Temperature Switch
36.
ASME Plate
3 - COMPONENT LISTING
Summary of Contents for Olsen OLSSC-299
Page 47: ...47 13 TROUBLE SHOOTING ...
Page 51: ...51 13 TROUBLE SHOOTING ...
Page 53: ...53 13 TROUBLE SHOOTING ...
Page 62: ...62 Supply Water Temperature Sensor Resistance Chart 13 TROUBLE SHOOTING ...
Page 84: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...