6
INSTALLATION INSTRUCTIONS
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not attempt
to assemble the product.
Estimated Installation Time:
20 minutes.
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors,
power drill with drill bit.
Helpful Tools (not included): Measuring tape, level
BB
Hardware Used
Handle
x 1
2. Locate wall bracket (B) and set aside.
Locate and mark wall stud locations where
cabinet (A) will be placed. Center wall
bracket (B) in desired level location off the
floor and mark locations where wall bracket
(B) meets the location of the wall studs.
Using hardware appropriate for your wall
type (not included), secure the wall bracket
(B) to the wall into preferably 2 wall studs. Use
hardware such as a cabinet screw or toggle bolt
depending on your wall type. Make sure the
wall bracket (B) is level and centered well to the
desired location of the cabinet (A). Be careful
not to disturb any plumbing or electrical lines that
may be concealed in the wall.
!IMPORTANT SAFTEY STEP!
It is critical to have a strong secure
connection to the wall before continuing to
the next step.
B
2
1
2
1
1
3
2
A
D
1. One handle (BB) is attached to the inside of
drawer (D), and the other handle is packaged
separately in the box. Use the attached string
to open the drawer initially. If you would like to
switch handles, simply remove the existing
handle and attach the other finish, as illustrated
in the diagram.
Note:
This wall cabinet comes with two
different drawer handle options.