Minimag™
Document: UMAU011367.docm
Revision: A03
Created by: KJB
Date: 26 Sep 2019
3063241-A03
Source Location: C:\ePDM\ISLEng\products\au-micromag\manuals\UMAU011367.docm
Page 20 of 26
User Ma
nual
!
Post-Operations Check
A Post-Ops inspection should be carried out after every deployment using the following checklist:
❑
Inspect the tether for damage as it is reeled in.
❑
Visually inspect vehicle for entrained debris or mechanical damage.
❑
Test each function to ensure proper operation.
❑
Clean the system by hosing it down with water at regular line pressure. Do not pressure wash. The
tracks may be cleaned off by hosing them down while running. If the system has been used in salt
water, thoroughly rinse the vehicle with fresh water right away.
❑
Take time to pack the system properly for transport away from the worksite.
❑
Store the system in a dry environment.
Note:
Ensuring the Minimag
™ system is always stored in good working condition will minimize
deployment time for future inspections.
Caution:
Use regular water line pressure to rinse. Do not use a pressure washer. The high-pressure
water jet can push past the seals.
Power-Up Sequence
Make sure all the equipment is properly connected before powering up. Once turned on, the controller
will run through a brief power up cycle. A start-up screen (discussed in the next section) will display
choice of crawler type and tether length. When this screen is cleared, the controller is ready for
operation.
If the system power is cycled off and back on quickly, the video overlay may not initialize properly. If this
occurs, turning the controller off for five to ten (5-10) seconds will allow the display to reset itself.
Always power the system down before connecting or disconnecting any equipment. In particular, never
connect or disconnect the camera with the power on.