10.
Attach the cable management sleeve strain relief chain clips to the strain relief points at the
rear of each tractor unit, as illustrated below.
Figure 20: Strain relief chain for the cable management
IMPORTANT
Ensure the strain relief chains are applied centrally to the scanner and allows for sufficient relief on the
cables. Depending upon the tractor unit distance adjust the strain relief chain length by altering the clip
position.
11.
Unzip the cable management sleeve and insert the required probe cables for the application.
Use Velcro ties to secure the probe cables to the encoder cable then zip up the cable
management sleeve. Feed the probe cable through the cable guides on the scanner frame to
the probe wedges.
IMPORTANT
Ensure that no undue strain can be put on the probe cables.
12.
Connect the water hose in the cable management sleeve to the water box on the scanner. If
required feed the hose through the hose guides on the scanner.
IMPORTANT
Ensure that no undue strain can be put on the water hoses.
13.
Connect the water hose to the pump.
14.
Tether the scanner from both tractor unit handles.
15.
Connect the encoder umbilical lead to the instrument by aligning the red dot. Depending upon
the function of the scanners on board control, the supplied encoder adapter cable may need to
be connected between the encoder umbilical and instrument.
IMPORTANT
If the Pause / Resume functionality is required do not use encoder adapter cable.
If the Increment / Encoder Reset functionality is required connect the encoder adapter cable.
16.
Setup the data acquisition unit. For Eddyfi PA UT instrument select LYNCS-CM in scanner list
NOTE
Typical encoder resolution: 25.85 pts/mm.
17.
Perform an encoder calibration and complete the remaining setup configuration.
18.
Place onto test item to perform scan.
19.
Start data acquisition on instrument and move scanner forward.