Magg™ 480 User Manual
Document: UMDU011367.docm
Revision: A06
Created by: JS
Date: 13 Apr 2021
IPN: 3063241-A06
Source Location: C:\ePDM\ISLEng\Products\DU-MiniMag\Manuals\UMDU011367.docm
Page 29 of 38
User Ma
nual
Post-Operations Check
A Post-Ops inspection should be carried out after every deployment using the following checklist:
❑
Inspect the tether for damage as it is reeled in.
❑
Visually inspect vehicle for entrained debris or mechanical damage.
❑
Test each function to ensure proper operation.
❑
Clean the system by hosing it down with water at regular line pressure. Do not pressure wash. The
tracks may be cleaned off by hosing them down while running. If the system has been used in salt
water, thoroughly rinse the vehicle with fresh water right away.
CAUTION:
Do not use a pressure washer to clean the camera. Very high-
pressure water can push past seals and flood the camera resulting in electrical
damage or personal injuries.
❑
Take time to pack the system properly for transport away from the worksite.
❑
Store the system in a dry environment.
Note:
Ensuring the
Magg™ 480 system is always stored in good working condition will minimize
deployment time for future inspections.
ICON™ Software
Vehicle control, video recording and export are accomplished using ICON graphical interface controller
software. The manual for ICON is integrated into the software.
•
ICON Manual
– Accessed through ICON or Desktop Shortcut.
Power-Up Sequence
After all wiring connections have been made, the system may be powered up. The recommended
sequence for power-up is as follows:
1. Power up the control computer and allow time for it to fully boot.
2. Turn on the Vehicle Power Supply.
3. Wait 5 seconds, then switch on the Interface Box.
4. Start the ICON (Controller) control program.
Note 1:
The interface box contains circuitry for auto tether tuning for best video reception.
If the
interface box is powered on first, the tuning circuitry may lock onto the blue screen which some
imagers produce and set tuning incorrectly.