background image

Hints and Tips Handbook

 

 

Eden

 

Greenhouses

 

Customer

 

Helpline

 

+44

 

(0)1242

 

676625

 

9

 

 

Section

 

7.

 

#

 

This

 

section

 

shows

 

you

 

how

 

to

 

assemble

 

the

 

slide

 

assembly

 

to

 

the

 

doors

 

for

 

your

 

greenhouse

 

(illustrated

 

right).

 

The

 

Eden

 

Zero

threshold

TM

 

range

 

has

 

only

 

two

 

different

 

widths

 

when

 

it

 

comes

 

to

 

the

 

door

 

slide

 

assembly

 

which

 

are

 

300mm

 

(Birdlip)

 

and

 

600mm

 

(Burford,

 

Blockley,

 

and

 

Bourton).

 

Below,

 

find

 

step

 

by

 

step

 

instructions

 

to

 

construct

 

the

 

door

 

slide

 

assembly.

 

This

 

method

 

can

 

be

 

used

 

on

 

all

 

doors

 

both

 

left

 

and

 

right

 

(note

 

picture

 

shown

 

right

 

is

 

a

 

right

hand

 

door

 

when

 

viewed

 

from

 

outside).

 

Start

 

by

 

sliding

 

the

 

brush

 

strip

 

(109)

 

into

 

the

 

bottom

 

door

 

assembly

 

bracket

 

(95)

 

and

 

secure

 

in

 

place

 

with

 

the

 

grub

 

screws

 

(104)

 

at

 

both

 

ends

 

as

 

shown

 

in

 

box

 

1

 

in

 

your

 

instruction

 

manual.

 

As

 

the

 

pictures

 

below

 

show,

 

remove

 

the

 

slider

 

inner

 

(114

 

A)

 

from

 

the

 

outer

 

of

 

the

 

slider

 

(114

 

B)

 

by

 

extending

 

the

 

slider

 

to

 

full

 

extent

 

then

 

as

 

shown

 

in

 

the

 

instruction

 

manual,

 

squeeze

 

the

 

lever.

 

By

 

doing

 

this

 

you

 

will

 

be

 

able

 

to

 

slide

 

(114

 

A)

 

out

 

from

 

(114

 

B).

 

Using

 

the

 

slider

 

layout

 

page

 

in

 

your

                                                                   

in

 

your

 

instruction

 

manual

 

in

 

section

 

7

   

 

                         

shown

 

(

right)

 

line

 

up

 

the

 

slider

 

inner

 

(114

 

A)

  

 

 

 

 

with

 

the

 

top

 

rail

 

depending

 

on

 

which

 

hand

 

door

 

you’re

 

constructing

 

then

 

secure

 

with

 

M4

 

nut,

 

bolt

 

and

 

a

 

star

 

washer

 

(102,

 

103

 

and

 

118)

 

as

 

shown

 

in

 

box

 

2.

 

As

 

shown

 

in

 

box

 

3

 

secure

 

the

 

slider

 

inner

 

(114

 

A)

 

to

 

the

 

bottom

 

door

 

assembly

 

bracket

 

(95)

 

referring

 

to

 

the

 

layout,

 

depending

 

on

 

which

 

hand

 

door

 

you’re

 

constructing,

 

with

 

M4

 

nut,

 

bolt

 

and

 

a

 

star

 

washer

 

(102,

 

103

 

and

 

118)

.

 

Box

 

4

 

shows

 

to

 

secure

 

the

 

outer

 

slider

 

(114

 

B)

 

to

 

the

 

front

 

base

 

assembly

 

bracket

 

(97),

 

referring

 

to

 

the

 

layout

 

depending

 

on

 

which

 

hand

 

door

 

you’re

 

constructing,

 

with

 

M4

 

nut,

 

bolt

 

and

 

a

 

star

 

washer

 

(102,

 

103

 

and

 

118)

.

As

 

shown

 

in

 

boxes

 

5,

 

6,

 

7

 

and

 

8,

 

slide

 

the

 

slider

 

inner

 

(114

 

A)

 

with

 

attached

 

bottom

 

door

 

assembly

 

bracket

 

(95)

 

into

 

the

 

outer

 

slider

 

(114

 

B)

 

with

 

attached

 

front

 

base

 

assembly

 

bracket

 

(97)

 

to

 

create

 

the

 

complete

 

bottom

 

slide

 

assembly.

 

Then

 

secure

 

the

 

complete

 

bottom

 

slide

 

assembly

 

to

 

the

 

bottom

 

of

 

the

 

door

 

with

 

3

 

square

 

headed

 

bolts

 

and

 

nuts

 

(50,

 

51)

 

as

 

shown

 

in

 

boxes

 

9

 

and

 

10.

 

If

 

you

 

have

 

a

 

double

 

door

 

model,

 

follow

 

these

 

instructions

 

using

 

the

 

pictures

 

in

 

your

 

instruction

 

manual

 

as

 

a

 

guide

 

for

 

the

 

remaining

 

door.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29

 

31

 

7.

 

#

 

Summary of Contents for Zero Threshold Birdlip

Page 1: ...EH 1 02 Customer Helpline 44 0 1242 676625 Mon Fri 9 00am 5 00pm mail eden greenhouses com Zero ThresholdTM Hints and Tips Handbook www edengreenhouses com Birdlip Burford Blockley Bourton...

Page 2: ...The new Eden Zero thresholdTM range of greenhouses are constructed using bolt channels Take note of where you will need to slide extra bolts into the channels for fixing horizontal bars bracing or ro...

Page 3: ...on 4 Bays 2 Inner bays 1 1 9 5 13 5 A These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of corner...

Page 4: ...or Aperture Bourton 4 Bays Door Aperture 2 2 These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of...

Page 5: ...e adjustments needed when it comes to glazing The table below will show the measurements needed for the bays Measurements are taken from the centre of the bolt channel to the next Model 618mm Birdlip...

Page 6: ...let it slide down then tighten back up As shown left C remove the nut from the bolt 51 50 to attach the diagonal brace then place nut back on the bolt loosely with brace now secured Then place into th...

Page 7: ...Birdlip All Burford All Blockley All Bourton All 5 The table left in Section 5 of your instructions shows how many square headed bolts nuts 50 51 are required to be pre loaded as shown below into the...

Page 8: ...lazing rubber 42 to the vent sides 25 Then pre load 2x square headed bolts and nuts 50 51 into the holes provided at either end of the vent head vent sill 24 26 Using the pre loaded bolt and nut slide...

Page 9: ...f the centre door rail 30 there is a channel which the black foam pad 112 needs to be slid into as shown in box 6 Next attach the centre door rail with black foam pad 30 112 using 2 pre loaded square...

Page 10: ...Using the slider layout page in your in your instruction manual in section 7 shown right line up the slider inner 114 A with the top rail depending on which hand door you re constructing then secure w...

Page 11: ...nual If you have a greenhouse 10ft or longer you must fit ground anchors 64 along the sides How to do this is illustrated in your instruction manual If you have chosen to anchor the greenhouse down on...

Page 12: ...e front integral base 18 as shown in boxes 6 or 8 Line up the holes on the front base slide bracket 97 with the holes on the front integral base 18 as shown in boxes 7 or 9 and 12 Then secure the two...

Page 13: ...traight edge to check Another way to check this is to measure from the centre of the bolt channel on both door posts checking they are the same distance apart all the way down I e parallel 1 1 2 3 Mak...

Page 14: ...E IF YOU HAVE HORTICULTURAL GLAZING AND YOUR GREENHOUSE IS IN AN EXPOSED OR WINDY AREA MORE SPRING WIRE GLAZING CLIPS ARE RECOMMENDED WE SUGGEST INCREASING THEM TO FOUR PER SIDE OF EACH PANE OF GLASS...

Page 15: ...es all the way down the length of the pane you should be able to hear the click as you go as shown right Some of the C2 capping requires cutting for the roof vent bays only To glaze the roof the same...

Page 16: ...to fit the plastic parts to your greenhouse This section is pretty self explanatory but to make the gutter ends 53 54 water tight we recommend sealing them with silicone to the ends of the gutters 2 T...

Page 17: ...Hints and Tips Handbook 16 Eden Greenhouses Customer Helpline 44 0 1242 676625...

Reviews: