background image

Hints and Tips Handbook

 

 

 

   

6

 

Eden

 

Greenhouses

 

Customer

 

Helpline

 

+44

 

(0)1242

 

676625

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

1

 

2a

 

2b

‐ 

x

 

/

 

x

 

/

‐ 

x

 

/

 

x

 

/

 

‐ 

x

 

/

 

x

 

/

PRE

LOAD

 

Section

 

5

 

This

 

section

 

shows

 

you

 

how

 

to

 

assemble

 

the

 

roof

 

of

 

your

 

greenhouse.

 

The

 

Eden

 

Zero

threshold

TM

 

range

 

has

 

only

 

one

 

size

 

of

 

bay

 

when

 

it

 

comes

 

to

 

the

 

roof

 

(illustrated

 

by

 

arrows,

 

right).

 

This

 

is

 

to

 

make

 

the

 

assembly

 

easy

 

and

 

to

 

minimise

 

adjustments

 

needed

 

when

 

it

 

comes

 

to

 

glazing.

 

The

 

table

 

below

 

will

 

show

 

the

 

measurements

 

needed

 

for

 

the

 

bays.

 

(Measurements

 

are

 

taken

 

from

 

the

 

centre

 

of

 

the

 

bolt

 

channel

 

to

 

the

 

next.)

  

Model

  

618mm

 

Birdlip

 

All

  

Burford

 

All

  

Blockley

 

All

   

Bourton

 

All

  

5

 

The

 

table

 

(

left

)

 

in

 

Section

 

5

 

of

 

your

 

instructions

 

shows

 

how

 

many

 

square

 

headed

 

bolts/nuts

 

(50,

 

51)

 

are

 

required

 

to

 

be

 

pre

loaded

 

as

 

shown

 

below

 

into

 

the

 

roof

 

glazing

 

bars

 

(1,

 

23).

 

Model

 

and

 

size

 

specific.

 

Doing

 

this

 

before

 

assembling

 

the

 

roof

 

will

 

save

 

time

 

when

 

it

 

comes

 

to

 

fitting

 

the

 

apex,

 

eaves

 

braces

 

and

 

vent

 

transoms

 

(

40,

 

60,

 

41,

 

and

 

27).

 

2a

2b

50,

 

51

 

50,

 

51

 

PRE

LOAD

PRE

LOAD

A

 

time

 

saving

 

tip

 

is

 

to

 

pre

load

 

the

 

ridge

 

bar

 

(22)

 

with

 

square

 

headed

 

bolts

 

and

 

nuts

 

(50,

 

51)

 

before

 

placing

 

into

 

position

 

as

 

shown

 

below

 

left.

  

In

 

section

 

3

 

the

 

tip

 

to

 

place

 

an

 

extra

 

square

 

headed

 

bolt

 

and

 

nut

 

(50,

 

51)

 

into

 

the

 

side

 

glazing

 

bars

 

(1)

 

now

 

comes

 

into

 

play

 

as

 

shown

 

below

 

right.

 

50,

 

51

 

1,23

22

 

40

 

1

1,

 

23

 

4

 

2

 

1

 

/

 

23

 

1

 

/

 

23

 

Summary of Contents for Zero Threshold Birdlip

Page 1: ...EH 1 02 Customer Helpline 44 0 1242 676625 Mon Fri 9 00am 5 00pm mail eden greenhouses com Zero ThresholdTM Hints and Tips Handbook www edengreenhouses com Birdlip Burford Blockley Bourton...

Page 2: ...The new Eden Zero thresholdTM range of greenhouses are constructed using bolt channels Take note of where you will need to slide extra bolts into the channels for fixing horizontal bars bracing or ro...

Page 3: ...on 4 Bays 2 Inner bays 1 1 9 5 13 5 A These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of corner...

Page 4: ...or Aperture Bourton 4 Bays Door Aperture 2 2 These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of...

Page 5: ...e adjustments needed when it comes to glazing The table below will show the measurements needed for the bays Measurements are taken from the centre of the bolt channel to the next Model 618mm Birdlip...

Page 6: ...let it slide down then tighten back up As shown left C remove the nut from the bolt 51 50 to attach the diagonal brace then place nut back on the bolt loosely with brace now secured Then place into th...

Page 7: ...Birdlip All Burford All Blockley All Bourton All 5 The table left in Section 5 of your instructions shows how many square headed bolts nuts 50 51 are required to be pre loaded as shown below into the...

Page 8: ...lazing rubber 42 to the vent sides 25 Then pre load 2x square headed bolts and nuts 50 51 into the holes provided at either end of the vent head vent sill 24 26 Using the pre loaded bolt and nut slide...

Page 9: ...f the centre door rail 30 there is a channel which the black foam pad 112 needs to be slid into as shown in box 6 Next attach the centre door rail with black foam pad 30 112 using 2 pre loaded square...

Page 10: ...Using the slider layout page in your in your instruction manual in section 7 shown right line up the slider inner 114 A with the top rail depending on which hand door you re constructing then secure w...

Page 11: ...nual If you have a greenhouse 10ft or longer you must fit ground anchors 64 along the sides How to do this is illustrated in your instruction manual If you have chosen to anchor the greenhouse down on...

Page 12: ...e front integral base 18 as shown in boxes 6 or 8 Line up the holes on the front base slide bracket 97 with the holes on the front integral base 18 as shown in boxes 7 or 9 and 12 Then secure the two...

Page 13: ...traight edge to check Another way to check this is to measure from the centre of the bolt channel on both door posts checking they are the same distance apart all the way down I e parallel 1 1 2 3 Mak...

Page 14: ...E IF YOU HAVE HORTICULTURAL GLAZING AND YOUR GREENHOUSE IS IN AN EXPOSED OR WINDY AREA MORE SPRING WIRE GLAZING CLIPS ARE RECOMMENDED WE SUGGEST INCREASING THEM TO FOUR PER SIDE OF EACH PANE OF GLASS...

Page 15: ...es all the way down the length of the pane you should be able to hear the click as you go as shown right Some of the C2 capping requires cutting for the roof vent bays only To glaze the roof the same...

Page 16: ...to fit the plastic parts to your greenhouse This section is pretty self explanatory but to make the gutter ends 53 54 water tight we recommend sealing them with silicone to the ends of the gutters 2 T...

Page 17: ...Hints and Tips Handbook 16 Eden Greenhouses Customer Helpline 44 0 1242 676625...

Reviews: