30
8. Appendix
2. Installation of the suction pipe
Sometimes it is necessary to cross the overflow pipe and the
suction pipe to connect
and
(Z)-M correctly.
MCM
EG
Please note that the suction pipe is installed without any
differences in level. Try to avoid these differences as much as
possible.
If these differences between
and
(Z)-M can not be
MCM
EG
avoided, the suction pipe must be installed rising from MCM
to
(Z)-M.
EG
suction pipe
bends, crossover-
fittings etc. only
in overflow pipe
NOTE!
i
Bends, crossover-fittings etc. which are necessary for crossing may only be installed at the
overflow pipe.
To ensure a trouble-free level compensation between the single vessels, suction pipe and
overflow pipe must be installed at ground level over the entire length.
suction pipe
overflow pipe