1. Product installation
It is mandatory to install a retention basin below the water heater if installed above a living area.
A drain connected to the sewer is required.
• Place the water heater in a room protected from frost
• Place it as close as possible to important points of use
• Make sure that the support element is sufficient to receive the weight of the water heater full of water.
Cut out the printed template on the cardboard
and use it to make the markings. Proceed to the
bolting of bolts Ø 10mm, or to pierce to receive
dowels of type MOLLY Ø 10mm. The wall must
hold a minimum load of 300 kg.
It is mandatory to install the water heater on a
support (optional quadripod). Place the water
heater on the bracket to mark the fixing points.
Make the holes and then reinstall the water
heater in its place. The anti-tilting fixing by the
upper bracket is obligatory (fixing Ø 10mm
minimum adapted to the wall).
If the wall is load-bearing (concrete, stone,
brick):
If the wall is not load-bearing :
2. Prohibited configurations
• Water heater extracting air from heated room or air with solvents or explosive materials.
• Connection to a heat recovery ventilation unit to the ducts to the attic.
• Duct on outside air and air exit indoor.
• Connection to an underground air duct.
• Water heater installed in a room together with a boiler connected to a chimney with natural draft and 1
duct to outside.
• Direct air connection to a cloth drying machine.
• Installation in dusty rooms.
• Direct air connection to cooking hoods with polluted and fatty air.